THE MYTH

The Mirasol will create much more additional traffic. Its impacts require a traffic light.

THE FACTS

This is not correct. The technical need for a new traffic signal is determined by objective traffic engineering standards applied to existing traffic volumes.

Expert traffic engineers have studied the impact of street traffic based on The Mirasol’s plans. These engineers have found there will be no significant increase in vehicle trips on Davis Blvd and no impact to the surrounding intersections performance as a result of the proposed changes to the property.


THE MYTH

The proposed project will add trucks and traffic on Adalia Ave.

THE FACTS

This is not correct.  The Mirasol team listened to the concerns of the neighborhood and committed to limiting impacts to neighbors on surrounding residential streets. No new curb cuts are being added on Adalia Ave or Baltic Circle. Trash and loading access, currently off of Adalia and Baltic, are relocated to Davis Blvd, improving the existing conditions.


THE MYTH

The project will make cars go through the “A Streets” and adjacent residential roads.

THE FACTS

This is not correct. The Mirasol team listened to the concerns of the neighborhood and revised the building plans to avoid this from happening. Specifically, the valet drop off and parking is now entirely provided in the south “wing” accessed from Davis Blvd.


THE MYTH

The valet will park off of Adalia Ave.

THE FACTS

This is not correct. Proposed valet operations have never included parking cars in the on-street spaces on Adalia Ave. The Mirasol team revised its plans to remove hotel uses from the north “wing” addition. Guest access, valet service, and parking all are located via an extensive driveway dropoff directly accessed from Davis Blvd. This dropoff is significantly larger than comparable hotels more than twice the size of the proposal.


THE MYTH

Parking will overflow onto residential neighborhood streets.

THE FACTS

The Mirasol has extensively reviewed parking, vehicle access, and valet operations to ensure it has both adequate parking supply, as well as prevents impacts on the surrounding neighborhood. Local parking operators have provided feedback and operational insights that informed the design.

The efficient operations will be supplemented with clear rules: Guests of the Mirasol will not be permitted to park along the surrounding neighborhood streets. Current parking is monitored and enforced for residents of The Mirasol (a practice that began with the new ownership in 2021), and ownership intends to continue this.

The Mirasol supports any community-driven effort to create DI-only resident parking restrictions on residential roads, as exists in other Tampa neighborhoods.


THE MYTH

The hotel will operate 24/7. It will bring constant noise.

THE FACTS

The Mirasol currently operates 24/7 as a residential property that is professionally managed, it has never received any noise complaints under the current ownership. The Mirasol will continue to observe the City of Tampa’s noise ordinances.

As a hotel, the Mirasol will observe quiet hours, limiting the time outdoor spaces can be utilized with 24/7 on-site enforcement. The primary event space on the property, just as it was 100 years ago, will be indoors in the Penthouse Sky Garden. The Mirasol’s number of guest rooms is relatively similar to luxury hotels found throughout Tampa, and amenities spaces are scaled in accordance with this size. The Mirasol’s interests as a hotel mirror those of the surrounding residential community, creating a tranquil and serene environment that is compatible with life on Davis Islands.


THE MYTH

Commercial use will destroy the residential character of Davis Islands; the project is out scale with Davis Islands Urban Village.

THE FACTS

The Mirasol has a distinct connection to Davis Islands, dating back a century. The existing historic property, which includes a seven-story tower, has been part of the fabric of Davis Islands community since its inception, built by the Island’s namesake himself, DP Davis. The Mirasol was an amenity and a luxury that drew residents to the Islands with a magnificent dining and social gathering space offered in the close-knit community.

This project is a beautiful nod to Davis Islands’ history, stewarded by DI residents as the managers of The Mirasol. Returning The Mirasol to its original use and authenticity will enhance and expand the quality of life of Davis Islands.

The Mirasol’s renovations fully restore the existing tower and wings in their existing form. The two new wings, infilling surface parking lots, fill holes in the neighborhood fabric. Each new building is set 15’ or more from the adjacent property lines, with a height of no greater than 35’, the residential height limit.


THE MYTH

The proposed project is out of scale with the underlying residential zoning and future land use code.

THE FACTS

No, The Mirasol building itself is an existing structure causing no change to the character or scale of the neighborhood. The land currently is zoned RM-35 and future land use code R-50. In code this is defined as, “intended for high-density residential developments… expected to embrace an urban form and prioritize pedestrian accessibility.”

The planned project is below the density and intensity allowed by existing zoning. Since originally filing the proposal, the Mirasol Team has further reduced the density and scale of the Project by 37% from the initial proposal. The two and three story “wings” are no more than 35’ in height nearest to the residences, with setbacks that exceed zoning requirements. The proposal is intentionally in-scale with both the residential neighborhood and the historic Mirasol tower.


THE MYTH

The project will make flooding worse.

THE FACTS

No, a primary focus of the project is ensuring the Mirasol’s renovation ensures its resiliency in future storms. A major part of that plan is to manage flood and stormwater. Specific to street flooding, developing two existing, impervious asphalt surface parking lots will significantly improve stormwater conditions, with major stormwater retention chambers incorporated into each new-construction “wing”.

The result will be a significant improvement to current conditions and a reduction in stormwater flowing onto surrounding streets.


THE MYTH

The Mirasol is operating as an illegal Airbnb and has created safety concerns due to rowdy behaviors of Airbnb guests.

THE FACTS

No, the Mirasol currently offers 9 short-term rental units with a minimum 7-night stay, which is legal under City ordinance and State law. These units are registered and licensed by the City of Tampa. Property Managers have not received any complaints due to perceived safety concern or unruly behavior. Primarily, these units are utilized by local residents (e.g. DI residents whose homes are undergoing renovations) and Tampa General Hospital employees, patients, and their families. In 2024, the average length of stay in these units was 17-nights (the 2025 YTD average length of stay is 13.4 nights).


THE MYTH

This renovation is not necessary to save it. The Mirasol does not need to be converted to a hotel to save it.

THE FACTS

Unfortunately, this is incorrect. Across the country, we have seen many examples of beautiful, historic architecture from a time passed shuttered, because these buildings require an incredible amount of consistent maintenance, thus financial costs. We are fortunate to have a magnificent plan to base this project on - the 100-year-old, original plan. Creating an intimate, luxurious mix of glamorous hotel rooms and suites with high-end long-term housing and a common gathering space as a common amenity offers The Mirasol a sustainable mechanism to continue to maintain this important landmark in the City’s history, while significantly investing in building systems and infrastructure for future storms. The high cost of damage restoration caused by the 2024 hurricane season only exacerbated the urgency and scope of investment needed to ensure the Mirasol can weather future storms.


Mirasol FAQ

  • The Mirasol is owned by Davis Islands resident Frank Carriera, along with a group of local Tampa investors.

  • The Mirasol was built as a hotel nearly a century ago, when it served as an amenity and gathering place for the Davis Islands community. Setting new standards for quality and elegance, the Mirasol helped create the Davis Islands Tampa knows today.

    The Mirasol was converted into apartments in 1962, and since then it has remained an architectural gem. However, the Mirasol needs significant investment to modernize the building systems, preserve its architectural character, and make it more resilient for the next 100 years.

    After evaluating numerous opportunities on how to most effectively restore and preserve The Mirasol, the ownership team has determined that restoring it to an elegant community-oriented hotel, along with a limited number of private residences, is the most feasible option.

    This necessary investment was reinforced this past October, when Hurricanes Helene and Milton impacted the Tampa Bay region. Along with many other homes and businesses on Davis Islands, The Mirasol suffered significant damage from flooding, storm surge, and wind. The storms were a reminder of the urgency of making investments in the building today and ensuring the Mirasol remains an icon on Davis Islands for the next 100 years.

  • While The Mirasol was originally built as a hotel, zoning regulations subsequently limited the use of the property to residential only.   It will need to be re-zoned to allow for hotel use on the site.

    Today, the site is zoned RM-35, allowing for medium-high density multi-family residential with a 120’ height limit.

    Re-zoning the Mirasol will be done through a “Planned Development (PD)”, which was filed on March 11, 2025. This process allows for zoning changes that recognize unique conditions and promoted planned diversification of uses.

    The PD will define key criteria for the project, setting the specific allowed uses, maximum area, height, parking, and other key elements to ensure the project will be compatible with the neighborhood and city standards.

  • As with most early-stage projects, the exact timeline for redevelopment is contingent upon the re-zoning process and market conditions.  The Mirasol will undergo a significant interior and exterior restoration and renovation process before it can reopen as a hotel.

  • The ownership team envisions the hotel as a boutique, luxurious property with an independent and locally oriented experience.   Discussions with potential hotel brands have started and will continue as more is learned through the community outreach and rezoning process.

  • Our current residents are welcome to remain at The Mirasol as we work through the initial planning process.   We will remain open and transparent with them as we work through planning and rezoning.  The eventual restoration and redevelopment of The Mirasol will take time, and ample notice will be provided to our residents in the event they need to relocate during the renovation process.

  • The restored Mirasol Hotel is envisioned to have luxurious amenities reminiscent of those it had when it first opened in 1926, including a restaurant, rooftop lounge (“sky garden”) with panoramic views -- along with many modern-day features and services such as a full-service spa and wellness programs, a tranquil pool, and concierge service.

  • If The Mirasol is not rezoned to allow for a hotel, the future of the property is uncertain. The conversion to a hotel, and the associated building improvements and upgraded systems, are necessary to sustain the building. The repairs needed will require the building to be vacant. It is not financially feasible to make those necessary improvements if it remains an apartment community.

  • No taxpayer dollars will be used to renovate or redevelop The Mirasol. In fact, The Mirasol’s redevelopment will increase tax revenue for the city in the future. The project budget will depend on the exact timeline and construction start dates. This will be a significant investment in Davis Islands and a long-term commitment to the community.

  • Once restored as a hotel, The Mirasol will be an amenity that will be open to the immediate neighbors and the greater Davis Islands community.   Currently, the property is restricted to residents. 

    By preserving the historic tower and limiting the scale and density of any new additions, the length and impact of the construction will be significantly less than a typical new development.

    Per the traffic study produced for the rezoning process, The Mirasol redevelopment’s traffic will have no impact on the level of service or performance of any of the surrounding intersections on the site. The project is also providing nearly twice as much on-site parking for residents, guests, employees and visitors. An access drive is proposed along Davis Blvd. ensuring that hotel drop off traffic will not impact cars on Davis Blvd. Loading and trash will be relocated from their current location on Adalia Avenue to an enclosed trash and loading space accessed off of Davis Blvd, mitigating noise and keeping trucks off neighborhood streets.

  • The docks will remain in its current configuration as a private recreational facility. There will be no commercial use. When the current ownership team purchased the property in 2021, the marina was in significant disrepair and a liability for the property and marina users. The owners were required to work with the Tampa Bay Port Authority to pull an emergency work permit to rebuild the marina to the condition it is in today.

  • The current plans include approximately 117 covered parking spaces on the site, an increase of over 53 spaces from the current asphalt parking lots on the property. Through detailed studies of other hotels in Hyde Park, Ybor City, West Shore and in other markets, the project team is confident this is more than adequate for the projected future use. he residential parking, residential guest parking, and employee parking all are in accordance with the current code and are included within the demand calculations.   

    The ownership team also fully supports Davis Islands resident-only parking restrictions on Adalia and Baltic, to the extent desired by the community, and will work with the community however they are able.

  • The final number of future employees will be determined with the hotel brand and operating partners after the rezoning process advances. We estimate 35 full time employees as part of our rezoning filing, and that the hotel to be a significant contributor the local economy through jobs, sales and hotel use taxes, and property taxes.

  • Our intent is to position the Mirasol as a luxury boutique hotel, aligning with the character and quality of the homes and community on Davis Islands. While room rates will be established when the hotel is near opening, they are expected to mirror the rates of nearby high-quality hotels.

  • The Mirasol façade will be restored and preserved, ensuring it’s character and iconic design remain part of Davis Islands! Fortunately, many historic images and records will be a reference point for the restoration process. The renovation will take place alongside the conversion project. As the building was originally a hotel, the interior spaces and rooms work very well with the exterior window locations, resulting in very few architectural alterations.

  • Please sign up for updates below and ask your neighbors to also support the project. We will share updates on the website and upcoming public events and meetings. We believe The Mirasol, once restored, will be an amazing destination and amenity for the community. The enthusiastic support of our neighbors will be necessary to successfully realize this vision. Thank you!

Haven’t found the answer you’re looking for? Reach out to us below and we will have an answer for your shortly.